doc-exports/docs/sdrs/umn/sdrs_06_0440.html
gtema 28ee660433 SDRS UMN initial version
Reviewed-by: Goncharov, Artem <artem.goncharov@t-systems.com>
Co-authored-by: gtema <artem.goncharov@gmail.com>
Co-committed-by: gtema <artem.goncharov@gmail.com>
2022-10-26 13:42:51 +00:00

909 B

What Are RPO and RTO?

Recovery Point Objective (RPO): the maximum data loss amount tolerated by the system.

Recovery Time Objective (RTO): the maximum service interruption duration tolerated by the system. It refers to the requirement for the recovery duration of an information system failure or service function failure caused by a disaster.

Figure 1 RPO and RTO