forked from docs/doc-exports
Reviewed-by: Wagner, Fabian <fabian.wagner@t-systems.com> Co-authored-by: Ru, Li Yi <liyiru7@huawei.com> Co-committed-by: Ru, Li Yi <liyiru7@huawei.com>
1.1 KiB
1.1 KiB
Assessment
Before changing shards, you need to carry out a preliminary evaluation and determine the number of new shards, whether to scale up the current DDM node class, and the number of required data nodes and their specifications.
- Data volume: Run show db status to query the volume of data involved.
- DDM node class: Determine nodes of the DDM instance and vCPUs and memory size of each node.
- Data node class: Determine the number of data nodes and vCPUs and memory size of each node.
- Business scale: Analyze current service scale and growth trend.
Parent topic: Shard Configuration