forked from docs/doc-exports
Reviewed-by: Rechenburg, Matthias <matthias.rechenburg@t-systems.com> Reviewed-by: Hasko, Vladimir <vladimir.hasko@t-systems.com> Co-authored-by: Xiong, Chen Xiao <chenxiaoxiong@huawei.com> Co-committed-by: Xiong, Chen Xiao <chenxiaoxiong@huawei.com>
2.0 KiB
2.0 KiB
How Do I Locate Job Scheduling Nodes with a Large Number?
If the number of daily executed nodes exceeds the upper limit, it may be caused by frequent job scheduling. Perform the following operations:
- In the left navigation tree of Data Development, choose , select the current day, and view the jobs that are frequently scheduled.
- In the left navigation tree of Data Development, choose to check whether the scheduling period of jobs that are frequently scheduled is set properly. If the scheduling period is inappropriate, adjust the scheduling period or stop the scheduling. Generally, the number of minute-level scheduling jobs executed every day exceeds the upper limit.
Parent topic: DataArts Factory