doc-exports/docs/cce/umn/cce_faq_00012.html
Dong, Qiu Jian f7b9a88535 CCE UMN update -20240625 version
Reviewed-by: Kovács, Zoltán <zkovacs@t-systems.com>
Co-authored-by: Dong, Qiu Jian <qiujiandong1@huawei.com>
Co-committed-by: Dong, Qiu Jian <qiujiandong1@huawei.com>
2024-09-04 11:43:54 +00:00

1.4 KiB

What Should I Do If a Workload Is Stopped Caused by Pod Deletion?

Problem

A workload is in Stopped state.

Cause:

The metadata.enable field in the YAML file of the workload is false. As a result, the pod of the workload is deleted and the workload is in the stopped status.

Solution

Delete the enable field or set it to true.