forked from docs/doc-exports
Reviewed-by: Hasko, Vladimir <vladimir.hasko@t-systems.com> Co-authored-by: Lu, Huayi <luhuayi@huawei.com> Co-committed-by: Lu, Huayi <luhuayi@huawei.com>
4.2 KiB
4.2 KiB
Importing and Exporting Workload Plans
You can commission a workload plan in the test environment and export the plan configurations to the production environment.
Exporting a Workload Plan
Importing a Workload Plan
- Log in to the GaussDB(DWS) management console.
- On the displayed Clusters page, click the name of the target cluster.
- Switch to the Workload Management tab page.
- Enter the plan details page, click Import, and select and import the target configuration file to the workload plan.
Parent topic: Managing Cluster Workloads