forked from docs/doc-exports
Reviewed-by: Hasko, Vladimir <vladimir.hasko@t-systems.com> Co-authored-by: Lu, Huayi <luhuayi@huawei.com> Co-committed-by: Lu, Huayi <luhuayi@huawei.com>
8.8 KiB
8.8 KiB
Stages of Workload Plans
Adding Stages for a Workload Plan
- Log in to the GaussDB(DWS) management console.
- On the displayed Clusters page, click the name of the target cluster.
- Switch to the Workload Management tab page.
- Go to the plan details page and click Add in the Plan stage area. On the Add Stage page, enter the stage name and configure the queue information. Confirm the configuration and click OK.
Modifying Stages for a Workload Plan
- Log in to the GaussDB(DWS) management console.
- On the displayed Clusters page, click the name of the target cluster.
- Switch to the Workload Management tab page.
- Go to the plan details page and click Modify in the Operation column of the target plan stage.
- On the Modify Stage page, you can modify information such as the switchover time and queue configurations.
Manually Switching Stages for a Workload Plan
If a running plan needs to be switched to a stage in advance, you can manually do it.
Deleting Stages for a Workload Plan
Parent topic: Managing Cluster Workloads