forked from docs/doc-exports
Reviewed-by: Hasko, Vladimir <vladimir.hasko@t-systems.com> Co-authored-by: Wang , Deng Ke <wangdengke2@huawei.com> Co-committed-by: Wang , Deng Ke <wangdengke2@huawei.com>
6.5 KiB
6.5 KiB
Editing a DR Task
For a DR task that has been created but not started, DRS allows you to edit the configuration information of the task, including the source and destination database details. For DR tasks in the following statuses, you can edit and submit the tasks again.
- Creating
- Configuration
Prerequisites
You have logged in to the DRS console.
Method 1
- In the task list on the Disaster Recovery Management page, locate the target task and click Edit in the Operation column.
- On the Configure Source and Destination Databases page, enter information about the service and DR databases and click Next.
- On the Check Task page, check the DR task.
- If any check fails, review the failure cause and rectify the fault. After the fault is rectified, click Check Again.
- If the check is complete and the check success rate is 100%, go to the Compare Parameter page.
- On the displayed page, specify Start Time and DR instance details. Then, click Submit.
Table 1 Task and recipient description Parameter
Description
Start Time
Set Start Time to Start upon task creation or Start at a specified time based on site requirements.
NOTE:Starting a DR task may slightly affect the performance of the service and DR databases. You are advised to start a DR task during off-peak hours.
- After the DR task is submitted, view and manage it on the Disaster Recovery Management page.
- You can view the task status. For more information about task status, see Task Statuses.
- You can click
in the upper-right corner to view the latest task status.
Parent topic: Task Life Cycle