Scaling in a Cluster

If a cluster can process existing data without fully using its resources, you can scale in the cluster to reduce costs. You are advised to scale in clusters during off-peak hours.

Prerequisites

The target cluster is available and has no tasks in progress.

Constraints

Procedure

  1. Log in to the CSS management console.
  2. In the navigation pane, choose a cluster type. The cluster management page is displayed.
  3. Choose More > Modify Configuration in the Operation column of the target cluster. The Modify Configuration page is displayed.
  4. On the Modify Configuration page, choose the Scale Cluster tab and click Scale in to set parameters.
    • Action: Select Scale in.
    • Resources: The changed amount of resources.
    • Nodes: The number of the default data nodes. For details about the value range that can be changed, see Table 1.
  5. Click Next.
  6. Confirm the information and click Submit.
  7. Click Back to Cluster List to switch to the Clusters page. The Task Status is Scaling in. When Cluster Status changes to Available, the cluster has been successfully scaled in.