If the hardware resources (such as the number of CPU cores and memory size) of the nodes for deploying NodeManagers are different but the NodeManager available hardware resources are set to the same value, the resources may be wasted or the status may be abnormal. You need to change the hardware resource configuration for each NodeManager to ensure that the hardware resources can be fully utilized.
NodeManager role instances must be restarted for the new configuration to take effect, and the role instances are unavailable during restart.
You have logged in to Manager.
Enter yarn.scheduler.maximum-allocation-vcores in the search box, and set the maximum number of available CPUs in a container. Enter yarn.scheduler.maximum-allocation-mb in the search box, and set the maximum available memory of a container. The instance level cannot be changed. The parameter values need to be changed in the configuration of the Yarn service, and the Yarn service needs to be restarted for the changes to take effect.
A message is displayed, indicating that the operation is successful. Click Finish. The NodeManager role instance is started successfully.