With a dashboard, different graphs can be displayed on the same screen. Different graphs, such as line graphs and digit graphs can be used to display resource data, so that you can view monitoring data comprehensively.
You can add key resource metrics to a dashboard and monitor them in real time. You can also compare the same metric of different resources on one screen. In addition, by adding routine O&M metrics to a dashboard, you can perform routine checks without re-selecting metrics when you open AOM again.
Before creating a dashboard, learn the types of graphs that can be added to a dashboard for accurate resource monitoring. The following graphs can be added to a dashboard:
You can use a line graph to compare the same metric of different resources. The following figure shows the CPU usage of different hosts.
The following figure shows the latest CPU usage.
The statuses of thresholds, hosts, and components can be displayed. The statuses of one or more threshold rules, hosts, or components can be added in one graph for monitoring. Titles of health status graphs can be customized.
Before adding a threshold-crossing status graph, create a threshold rule. Otherwise, the threshold-crossing status graph cannot be added.
Before adding a threshold-crossing status graph, create a threshold rule. Otherwise, the graph cannot be added.
The following shows how to add a line graph to a dashboard:
After creating a dashboard, you can also perform the operations described in Table 1.
Operation Object |
Operation |
Description |
---|---|---|
Dashboard |
Set an interpolation mode |
For details, see Table 2. |
Save as |
Click More in the upper right corner of the Dashboard page, and choose Save As, Rename, or Delete from the drop-down list. |
|
Rename |
||
Delete |
||
Export a monitoring report |
Click Export Monitoring Report to export only line graphs in the dashboard as CSV files to a local PC. |
|
Metric graph |
Add |
Click Add Metric Graph to add a line graph, digit graph, threshold-crossing status graph, host status graph, or service status graph to the dashboard. |
Modify |
Choose Modify Copy, Delete, or View Larger (support only for line graphs) from the Operation drop-down list. Figure 6 Metric graph
![]() NOTE:
In a dashboard, when resources such as hosts and services are deleted, metric graphs created for these resources are not automatically deleted. To improve system performance, manually delete unnecessary graphs. |
|
Copy |
||
Delete |
||
Zoom in |
||
Refresh |
||
Resize |
Hover over the lower right corner of a metric graph. When the cursor changes to |
|
Reposition |
Hover over the blank area in the upper or lower part of a graph, and drag and drop it to the desired position. |