:original_name: cce_10_0403.html .. _cce_10_0403: Changing Cluster Scale ====================== Scenario -------- CCE allows you to change the number of nodes managed in a cluster. Notes and Constraints --------------------- - This function is supported for clusters of v1.15 and later versions. - Starting from v1.15.11, the number of nodes in a cluster can be changed to 2000. The number of nodes in a single master node cannot be changed to 1000 or more. - Currently, a cluster can only be scaled out to a larger specification, but cannot be scaled in. - During the specifications change, master nodes will be powered off and on, and the cluster cannot run properly. Perform the change during off-peak hours. - Changing the cluster scale does not affect the services running in the cluster. However, the control plane (master nodes) will be interrupted for a short period of time. You are advised not to perform any other operations (such as creating workloads) during the change. - Change failures will trigger a cluster rollback to the normal state. If the rollback fails, submit a service ticket. Procedure --------- #. Log in to the CCE console. In the navigation pane, choose **Clusters**. #. Click |image1| next to the cluster whose specifications need to be changed. #. On the page displayed, select a new flavor for **Target Flavor** as required. #. Click **OK**. You can click **Operation Records** in the upper left corner to view the cluster change history. The status changes from **Executing** to **Successful**, indicating that the cluster specifications are successfully changed. .. |image1| image:: /_static/images/en-us_image_0000001236723668.png